BSBCC Observation Platform section drawing

BSBCC Phase II tendering

22 contractors attended a site visit to BSBCC on 3rd June to decide whether to tender for phase II works. Phase I was completed in March 2010 giving us a new bear house and 1ha of electric fenced forest enclosure with capacity for 20 bears. The second phase due to start in September 2011 will give us an observation platform and allow the centre to open to the public in March 2012. Contractors were briefed in the Sepilok Orang-utan Rehabilitation Centre (SOURC). In the foreground is BSBCC Manager Ng Wai Pak. The briefing...

Welcome Chris & Daniele

By Ian Hall Two new architectural volunteers have arrived in Seplikok to help with the next phase of the Bornean Sun Bear Conservation Centre (BSBCC). They'll be working with organisations such as Raleigh to build peripheral infrastructure and at the same time assisting to prepare tender drawings for the new visitor centre that is hoped to start construction in early 2011. They are pictured here getting all enthusiastic with their sketchbooks at Ba Linn rooftop bar in Sandakan. Chris is an RIBA Part I student on his year...

Fruits and a Flycatcher

Text and photos by Ian Hall I was up before dawn to watch the sun rise from the view point at Borneo Rainforest Lodge. I could see nothing on account of cloud and so I lay down on the bench and went to sleep for a while. I was woken up by an orang-utan rustling the branches above me. I ignored it and rolled over on my binoculars-rolled-up-in-my-hat pillow. Another rustle and debris showered the observation deck. ‘OK you bugger, I’m getting up’ I grumbled and went to check on the progress of the view. The reason...

Arkitrek Volunteer, Billy Dunn at Sepilok

Bye Bye Billy

Arkitrek's first volunteer Billy arrived in September 2009 for a three month stint working at the Borneo Sun Bear Conservation Centre (BSBCC). Originally due to go home at Christmas, the bears got their claws into Billy and he ended up staying an extra two months. Finally though the day came when we had to say good bye and thanks. Billy's outstanding contribution was to the design of the next phase visitor centre and to the volunteer program that Arkitrek helps to manage on behalf of BSBCC. To date the Bear Action Teams...

BSBCC Phase I nearly complete

By Ian Hall The new bear house at the Bornean Sun Bear Conservation Centre Should have been completed this month however we have been delayed by bad weather. Our site being low lying and barely above the water table has degenerated into bottomless gloop. luckily most of the building was up before the rainy season but materials deliveries and availability of dry working space has suffered. Under the conditions the contractor has done us proud and the quality of workmanship in the most important components, the cages,...